Search Results
We Pass 2 Project Concludes: Restoring Migration Routes for the Danube’s Iconic Fish
The We Pass 2 project, an ambitious initiative to restore fish migration routes at the Iron Gate Dams on the Danube River, has reached a successful conclusion. Building on the achievements of the original We Pass project, We Pass 2 focused on creating preliminary designs and cost estimates for solutions to enable fish passage at Iron Gate 1 and 2, which sit on the border between Romania and Serbia.
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... Public Consultation for the Draft Management Plan Updates 2027
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.
Stakeholder Consultation: Shaping the Future of the Danube River Basin
The voice of our stakeholders matters in shaping the future of the Danube River Basin. As part of our commitment to effective water management and in accordance with the EU Water Framework Directive and EU Floods Directive, we invite all stakeholders to participate in this crucial process.
ICPDR Releases Condensed Summary of Danube Declaration 2022
The Danube Declaration 2022, the result of the 4th ICPDR Ministerial Meeting, presents a comprehensive overview of crucial initiatives and goals for the region. Adopted by Danube Ministers, the Danube Declaration adds political steering to the two Management Plans. To make the Declaration more accessible to the general public, the ICPDR's Public Participation Expert Group has condensed its content into a concise summary. The outcome is a 3-page brochure that summarizes the main messages and implications of the Declaration in an easy-to-understand format.
-
Summary of the Danube Declaration 2022 (523.11 KB)
The 2022 Danube Declaration addresses issues with crossing the border along the Danube river, including environmental problems and the risk of flooding. It follows the rules set by the EU Water... Shared waters – joint responsibilities: ICPDR presents Annual Report 2021
The 2021 Annual Report provides detailed insight into an eventful year for the ICPDR– from the updates of the two Management plans and the return of in-person Danube Day events to the completion of the fourth Joint Danube Survey (JDS4). The 2021 Annual Report depicts this broad spectrum of ICPDR activities. It illustrates the ICPDRʼs ever-broadening commitment as needed by the multi-faceted nature of the Danube River itself.
Danube Watch 3/2021 - Danube Watched
Danube Watch 2/2021 - WePass: Explained
-
We Pass: Explained (low resolution) (9.37 MB)
A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates. (Lower Resolution version)