Search Results
One river: finding continuity for habitats
Re-establishing river continuity is a key issue for fish, but is also necessary to achieve the objectives of the EU Water Framework Directive.
-
Danube Watch 3/2012 (1.23 MB)
Hydropower
Following a request by the Danube Ministerial Conference 2010, the ICPDR has become active in initiating a dialogue with representatives from the hydropower sector. As an essential step in this process, "Guiding Principles on Sustainable Hydropower Development in the Danube Basin" have been developed by an interdisciplinary team and were finalised and adopted in June 2013.
Danube Photo Gallery
The Danube River has many faces. In this photo gallery, some impressions are presented that show the diversity of this river. The pictures were taken by Victor Mello.
2012 interim report on implementation of Joint Program of Measures
Vienna, 10 Jan 2013. The 2012 "Interim Report on the Implementation of the Joint Program of Measures in the Danube River Basin District" was published by the ICPDR. Here you can download the document.
-
Annexes - 2012 Interim Report on the Implementation of the JPM in the DRBD (1.33 MB)
-
2012 Interim Report on the Implementation of the Joint Program of Measures in the DRBD (1.34 MB)
Bosnia & Herzegovina takes over ICPDR Presidency
Vienna, 15 Jan 2013. In the framework of a ceremony held in Vienna today, Bosnia and Herzegovina took over the presidency of the International Commission for the Protection of the Danube River (ICPDR).
Public Participation Schedule WFD & FD
Vienna, 19 Dec 2018. According to Art. 14 of the Water Framework Directive, public participation in drafting River Basin Management Plans needs to be ensured. The ICPDR now provides a blue print for Public Participation activities for the development of the third Danube River Basin Management Plan (3rd DRBMP) until 2021 and the second Danube River Basin Flood Risk Management Plan (2nd FRMP).
-
Public Participation Schedule WFD & EFD (74.21 KB)