Search Results
Finding financing: funding options for the Joint Programme of Measures
-
Background Paper: reducing hazardous substances (142.74 KB)
Workshop on Joint Program of Measures
Vienna, 4-5 April 2013. The ICPDR will hold a meeting to discuss the results of the Danube Joint Program of Measures, to learn about funding needs and existing potential funding for the actions, and to discuss the preparation of the Danube Basin Analysis and the 2nd Danube River Basin Management Plan.
-
Reducing Nutrient Pollution: Challenges in Agriculture (322.71 KB)
2012 interim report on implementation of Joint Program of Measures
Vienna, 10 Jan 2013. The 2012 "Interim Report on the Implementation of the Joint Program of Measures in the Danube River Basin District" was published by the ICPDR. Here you can download the document.
-
Annexes - 2012 Interim Report on the Implementation of the JPM in the DRBD (1.33 MB)
-
2012 Interim Report on the Implementation of the Joint Program of Measures in the DRBD (1.34 MB)
Accident at Ajka alumnia plant
Kolotar, 4 October 2010. The acute toxic risk deriving from the heavy metals in the red sludge is rather low, as their concentrations are rather low. However, the chronic toxicity threat is high.
Danger heading downstream: the Accident Emergency Warning System in action
AEWS - Accident Emergency Warning System
The Accident Emergency Warning System (AEWS) of the Danube River Basin is activated whenever there is a risk of transboundary water pollution, or threshold danger levels of certain hazardous substances are exceeded.