Search Results
JDS3 Final Scientific Report available
Vienna, 22 March 2015. The Joint Danube Survey 3 (JDS3) was the world’s biggest river research expedition in 2013. Its results are now available in a comprehensive report, which can be downloaded from this website.
Joint Danube Survey 3
The Joint Danube Survey 3 (JDS3) was the world’s biggest river research expedition of its kind in 2013, the UN International Year of Water Cooperation. Its results were published in a comprehensive report in early 2015.
Joint Danube Survey
The key purpose of Joint Danube Surveys (JDS) is to produce reliable and comparable information on carefully selected elements of water quality for the length of the Danube River, including its major tributaries. Three Joint Danube Surveys have previously been conducted, in 2001, 2007, 2013, and 2019. The 5th Joint Danube Survey is due to launch on 1st July 2025.
-
Danube River Basin Management Plan Brochure (9.88 MB)
Joint Danube Delta Survey (JDDS) ready to start
Danube Delta, 26 September 2011. A detailed analysis and assessment of the Danube Delta will be held within the project "Joint environmental monitoring, assessment and exchange of information for integrated management of the Danube delta region" from 26 September until l 7 October 2011.
-
DRBM Plan Maps (25.36 MB)
complete set, 31 maps -
DRBM Plan Annexes (5.02 MB)
complete set, 426 pages -
Danube River Basin Management Plan (8.44 MB)
Danube River Basin Management Plan (DRBMP) 2009
The Danube River Basin Management Plan guides the way to achieving at least good status for all waters of the Danube River Basin. The plan below covers the period from 2009 until 2015.
-
JDS2 Final Results available (130.92 KB)