Search Results
-
WFD & FD Public Participation Schedule (326.84 KB)
This document focuses on the basin-wide level and is complementary to the public participation processes on the national and sub-basin levels, which follow closely Article 14 of the WFD and its... ICPDR Releases "Ice Report 2017"
Freezing weather conditions in the winter months have been a fact of life on the Danube since time immemorial, but the months of January and February 2017 saw many countries in the Danube Basin and its tributaries facing an especially bleak situation.
Solutions for a frozen river: cross border ice control on the Danube
Ice control has a long history on the Danube river. The extremely low temperatures experienced in the past weeks throughout the Danube River basin which have been causing continuous ice formation on the Danube are reminding us of the importance of cross-border cooperation.
-
2014 Floods in the Sava River Basin (1.56 MB)
-
FRM Plan: Draft Annex 1 (Hazard and Risk Maps Update) (5.72 MB)
The draft Annex 1 of the 1st Flood Risk Management Plan for the DRB, provided for public comments. -
2013 Floods in the Danube River Basin (1.39 MB)
-
2002 Floods in the Danube River Basin (119.18 KB)
-
Map of Areas of Potential Significant Flood Risk in DRB 2013 (7.39 MB)
Public Participation Schedule WFD & FD
Vienna, 19 Dec 2018. According to Art. 14 of the Water Framework Directive, public participation in drafting River Basin Management Plans needs to be ensured. The ICPDR now provides a blue print for Public Participation activities for the development of the third Danube River Basin Management Plan (3rd DRBMP) until 2021 and the second Danube River Basin Flood Risk Management Plan (2nd FRMP).
-
Public Participation Schedule WFD & EFD (74.21 KB)