Search Results
World's Largest Surface Water Monitoring Project Launches On The Danube
Vienna, 1 July 2025 (Motto am Fluss) - Held every six years, the Joint Danube Survey (JDS) builds on the legacy of its predecessors and brings together experts from across the Danube River Basin and beyond for its implementation. The Survey conducts the most comprehensive scientific analysis of Europe’s second-longest river. Today marks the official launch of the fifth edition of this unique initiative: JDS5.
The Danube at UNESCO: JDS5 Featured at Global Water Science Celebration
Paris, 12 June 2025 – As UNESCO celebrates 60 years of global water science and the 50th anniversary of the International Hydrological Programme (IHP), the ICPDR proudly contributed to this international milestone by co-hosting a side event that placed the Joint Danube Survey 5 (JDS5) firmly in the spotlight.
Joint Danube Survey 5 Scheduled to Launch 1st July
The Joint Danube Survey 5 (JDS5), the world’s most comprehensive investigative surface-water monitoring effort, will officially kick off on 1 July 2025 in Vienna. This large-scale scientific survey will bring together experts from 14 countries to assess the health of the Danube River and its major tributaries.
New Report Highlights the Urgent Need for Improved Water Resilience Across Europe
The European Environment Agency (EEA) has released its latest report, “Europe’s State of Water 2024: The Need for Improved Water Resilience,” shedding light on the growing challenges to Europe’s water security. The report, which draws on data from the 3rd River Basin Management Plans (RBMPs), highlights significant pressures on surface and groundwater bodies across Europe, emphasizing the need for immediate action to strengthen water resilience.
Successful Biannual Danube Forecasting Forum (DAFF) Enhances Flood Forecasting
On October 10th and 11th, the much-anticipated biannual Danube Forecasting Forum (DAFF) took place in Budapest, Hungary. Organized in collaboration with the International Commission for the Protection of the Danube River (ICPDR) and the EU Joint Research Center (EU JRC), this event brought together stakeholders from the 13 countries along the Danube and members of the Danube Youth Council (DYC) under EUSDR PA5.
Preliminary Flood Risk Assessment (PFRA)
In accordance with Article 4 of the EU Floods Directive (FD), the first milestone in the FD basin-wide implementation is undertaking a preliminary flood risk assessment (PFRA), as well as identifying those areas for which it has been concluded that potential significant flood risks exist or might be considered likely to occur, so-called Areas of Potential Significant Flood Risk (APSFR), as in accordance with FD Article 5.
Severe Droughts in the Danube River Basin
As the climate crisis worsens, severe droughts devastate European landscapes. According to the data published by the European Drought Observatory, more than 60% of land in the European Union and United Kingdom – an area nearly the same size as India (!) – is now affected by drought conditions. The Danube River Basin and the Danube itself have been affected by serious droughts in the past, e.g., in 2003, 2015, and now again one of the most feared natural phenomenon has gripped much of the Danube River Basin.
-
Danube Declaration 2022 (551.84 KB)
Adopted at the ICPDR Ministerial Meeting on 8 February 2022. A Vision for Integrated Water Management in Our Shared Basin: Building a Sustainable Future in the Danube River Basin -
Preliminary Flood Risk Assessment in the Danube River Basin 2018 (1.86 MB)
-
Map of Areas of Potential Significant Flood Risk in DRB - Update 2019 (7.86 MB)