Search Results
-
Public Consultation for the Draft Management Plan Updates 2027
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.
-
Successful Biannual Danube Forecasting Forum (DAFF) Enhances Flood Forecasting
On October 10th and 11th, the much-anticipated biannual Danube Forecasting Forum (DAFF) took place in Budapest, Hungary. Organized in collaboration with the International Commission for the Protection of the Danube River (ICPDR) and the EU Joint Research Center (EU JRC), this event brought together stakeholders from the 13 countries along the Danube and members of the Danube Youth Council (DYC) under EUSDR PA5.
-
Preliminary Flood Risk Assessment (PFRA)
In accordance with Article 4 of the EU Floods Directive (FD), the first milestone in the FD basin-wide implementation is undertaking a preliminary flood risk assessment (PFRA), as well as identifying those areas for which it has been concluded that potential significant flood risks exist or might be considered likely to occur, so-called Areas of Potential Significant Flood Risk (APSFR), as in accordance with FD Article 5.
-
Sub-basins
Sub-basins are smaller working units within a larger river basin or catchment area. They represent a distinct geographical area that is delineated based on the natural drainage patterns of rivers and their tributaries. Sub-basins are used to facilitate the management and assessment of water resources, allowing for more focused and localized analysis and planning within the broader context of the overall river basin.
-
Danube Watch 3/2021 - WACOM: Water Contingency Management in the Sava River Basin
-
Preliminary Flood Risk Assessment in the Danube River Basin 2018 (1.86 MB)
-
Map of Areas of Potential Significant Flood Risk in DRB - Update 2019 (7.86 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 - Maps (44.99 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 - Annexes (8.08 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 (4.62 MB)