Search Results
-
Danube Countries Gather in Uzhhorod for 24th ICPDR Standing Working Group Meeting
Uzhhorod, Ukraine, 11–12 June 2026 – The ICPDR has held its 24th Standing Working Group (SWG) Meeting in a hybrid format, bringing delegations and observers together in person in Uzhhorod, Ukraine, and online from across the Danube River Basin.
-
Report on 2023 Floods (2.97 MB)
This document provides a concise overview of the major flood events that occurred across the Danube River Basin in summer 2023. It highlights the most affected regions, summarizes the key developments... -
Ukraine Adopts Nine River Basin Management Plans: A Major Milestone Towards Sustainable Water Management
Ukraine, one of the 15 ICPDR contracting parties, has officially adopted all its nine River Basin Management Plans (RBMPs), marking a significant step towards sustainable water management in line with European Union (EU) and international standards.
-
Slovenia's Flood Forecasting Success: Minimizing Casualties Through Effective Warning Systems
In the wake of what has been declared the nation's 'worst-ever natural disaster,’ more than 70% of Slovenia's territory, predominantly situated in the Danube River Basin, has been severely affected by extreme flooding. The scale of this catastrophe has led to billions of Euros in damages and a tragic loss of lives.
-
Statement by the ICPDR on the Situation Around Ukrainian Ports on the Lower Danube
VIENNA, 29 August (ICPDR) – The International Commission for the Protection of the Danube River (ICPDR) is committed to maintaining and preserving the cleanliness, health, and safety of the Danube River Basin.
-
Significant Water Management Issues (SWMIS)
The EU Water Framework Directive aims to make all waters cleaner and healthier. To meet these requirements, the ICPDR's Danube River Basin Management Plan closely examines the most important pressures affecting water status.
Significant water management issues, called SWMIs, are the central pressures of basin-wide importance affecting the ecological and chemical status of surface waters, including pollution by organic substances, nutrients, and hazardous substances, as well as hydromorphological alterations. The first interim overview on the Significant Water Management Issues was created in 2007 for the 1st DRBM. The SWMIs outlined in this report were derived based on the requirements of the WFD and mainly related to quality aspects. For transboundary groundwater bodies, both qualitative and quantitative issues are addressed. -
Danube Watch 3/2021 - WACOM: Water Contingency Management in the Sava River Basin
-
Updated Integrated Tisza River Basin Management Plan 2019 - Maps (44.99 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 - Annexes (8.08 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 (4.62 MB)