Search Results
Displaying 1 - 10 of 25 results found
-
Public Consultation for the Draft Management Plan Updates 2027
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.
-
Danube Watch 3/2021 - ICPDR Presidency 2022
-
Updated Integrated Tisza River Basin Management Plan 2019 - Maps (44.99 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 - Annexes (8.08 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 (4.62 MB)
-
Tisza Group, Memorandum of Understanding (2019) (1.53 MB)
"Strengthening of Tisza River Basin cooperation: Towards the implementation of the Integrated Tisza River Basin Management Plan supporting the sustainable development of the region" -
Danube Declaration 2016 (214.47 KB)
Adopted at the ICPDR Ministerial Meeting on 9 February 2016: Water Management in the Danube River Basin: Integration and Solidarity in the most international river basin of the world -
Danube Flood Risk Management Plan (DFRMP) 2015
-
DRBM Plan Update 2015 - Complete set of Maps (37.73 MB)
Complete set of thematic maps supplementing the Danube River Basin District Management Plan - Update 2015. -
DRBM Plan Update 2015 - Annexes (9.72 MB)