Library
Publications, documents and all other content
-
Public consultation concludes with strong feedback
Danube Basin, 23 July 2015. For over six months, stakeholders of the Danube were called to share their views on the draft management plans for the Danube River Basin. As of 22 July, the public consultation phase convened with strong feedback received through different channels.
-
Joint Paper on Cooperation and Synergy for the EUSDR Implementation - Annexes (1.13 MB)
-
Joint Paper on Cooperation and Synergy for the EUSDR Implementation (899.71 KB)
-
2014 Floods in the Sava River Basin (1.56 MB)
-
Voice of the Danube: Stakeholders have expressed their views
Zagreb, 3 July 2015. Today, the ICPDR Stakeholder Conference “Voice of the Danube” has convened in the Croatian capital. Over 80 stakeholders from a broad range of backgrounds stood the heat and expressed their views on the draft management plans for the Danube River.
-
Public Participation: Interim Overview on Significant Water Management Issues
Vienna, 17 Dec 2013. The ICPDR provides an interim overview on Significant Water Management Issues in the Danube River Basin District for the 2nd Danube River Basin Management Plan (2nd DRBMP) and invites the public to comment on this document until June 2014.
-
Interim Overview Significant Water Management Issues in DRBD (527.76 KB)