Library
Publications, documents and all other content
Displaying 1 - 10 of 156 items
-
Public consultation concludes with strong feedback
Danube Basin, 23 July 2015. For over six months, stakeholders of the Danube were called to share their views on the draft management plans for the Danube River Basin. As of 22 July, the public consultation phase convened with strong feedback received through different channels.
-
Joint Paper on Cooperation and Synergy for the EUSDR Implementation - Annexes (1.13 MB)
-
Joint Paper on Cooperation and Synergy for the EUSDR Implementation (899.71 KB)
-
2014 Floods in the Sava River Basin (1.56 MB)
-
Voice of the Danube: Stakeholders have expressed their views
Zagreb, 3 July 2015. Today, the ICPDR Stakeholder Conference “Voice of the Danube” has convened in the Croatian capital. Over 80 stakeholders from a broad range of backgrounds stood the heat and expressed their views on the draft management plans for the Danube River.
-
FRM Plan: Draft Annex 4 (Bilateral Agreements) (162.78 KB)
The draft Annex 4 of the 1st Flood Risk Management Plan for the DRB, provided for public comments. -
FRM Plan: Draft Annex 3 (Competent Authorities) (126.9 KB)
The draft Annex 3 of the 1st Flood Risk Management Plan for the DRB, provided for public comments. -
FRM Plan: Draft Annex 2 (Measures) (288.2 KB)
The draft Annex 2 of the 1st Flood Risk Management Plan for the DRB, provided for public comments. -
FRM Plan: Draft Annex 1 (Hazard and Risk Maps Update) (5.72 MB)
The draft Annex 1 of the 1st Flood Risk Management Plan for the DRB, provided for public comments. -
FRM Plan: Draft 1st Flood Risk Management Plan for the DRB (9.31 MB)
The draft 1st Flood Risk Management Plan for the Danube River Basin, provided for public comments