Library

Publications, documents and all other content

Displaying 1 - 10 of 128 items
  • News & Media 23 July 2015

    Public consultation concludes with strong feedback

    Danube Basin, 23 July 2015. For over six months, stakeholders of the Danube were called to share their views on the draft management plans for the Danube River Basin. As of 22 July, the public consultation phase convened with strong feedback received through different channels.

  • Legal Documents

    Joint Paper on Cooperation and Synergy for the EUSDR Implementation - Annexes (1.13 MB)

  • Legal Documents

    Joint Paper on Cooperation and Synergy for the EUSDR Implementation (899.71 KB)

  • Publications

    2014 Floods in the Sava River Basin (1.56 MB)

  • News & Media 3 July 2015

    Voice of the Danube: Stakeholders have expressed their views

    Zagreb, 3 July 2015. Today, the ICPDR Stakeholder Conference “Voice of the Danube” has convened in the Croatian capital. Over 80 stakeholders from a broad range of backgrounds stood the heat and expressed their views on the draft management plans for the Danube River.

  • News & Media

    Public Participation Schedule WFD & FD

    Vienna, 19 Dec 2018. According to Art. 14 of the Water Framework Directive, public participation in drafting River Basin Management Plans needs to be ensured. The ICPDR now provides a blue print for Public Participation activities for the development of the third Danube River Basin Management Plan (3rd DRBMP) until 2021 and the second Danube River Basin Flood Risk Management Plan (2nd FRMP).

  • Publications

    ICPDR Climate Change Adaptation Strategy 2012 (4.15 MB)

    In order to take the required steps on adaptation to climate change, the ICPDR was asked in the “Danube Declaration” from 2010 to develop a Climate Adaptation Strategy for the Danube River Basin by...
  • News & Media

    15th Ordinary Meeting in Vienna

    Vienna, 11 - 12 December 2012. The ICPDR has held its 15th Ordinary Meeting in Vienna. At this plenary meeting of the commission, important decisions were made. Here you find a photo gallery showing some of the highlights.

  • News & Media

    1st ICPDR Workshop on Hydropower and Water Management

    Timişoara, 21/22 February 2012. Cooperation on navigation is already ongoing and has now been launched for hydropower: efforts are needed in creating win-win situations and benefits for all actors involved. The 1st ICPDR Workshop on Hydropower and Water Management was organised by Romania (Apele Romane) in close cooperation with the other two Lead Countries Austria and Slovenia and the ICPDR.

  • News & Media

    Workshop on River and Habitat Continuity

    Vienna, 4/5 September 2012. The ICPDR held a workshop on river and habitat continuity to support the ongoing developments in the implementation of the EU Water Framework Directive and related legislation in the Danube River Basin with regard to addressing river and habitat continuity.