Maps & Data
Displaying 11 - 20 of 29 items
-
Updated Integrated Tisza River Basin Management Plan 2019 - Maps (44.99 MB)
-
Ecoregions – DRBMP Plan Update 2021 – Map 2
Within the boundaries of the Danube River Basin, several distinct ecoregions have been defined, based on the different geographical distributions of fauna and flora depending on the natural characteristics of the environment.
-
DRBMP Update 2015 - Map 2: Ecoregions (1.55 MB)
-
Maps of the Integrated Tisza River Basin Management Plan 2010 (15.86 MB)
-
Map 2: Ecoregions (1.05 MB)
-
Maps 4, 7, 15-23 (3.6 MB)
Surface Layers Permeability, Isohyets of the Multi-Annual Mean Precipitation, Mean Annual Runoff, Flood Defences (Hungary, Ukraine), Improvement of Flood Conveyance Capacity (Hungary), Flood (Hungary)... -
Map 14: Risk to reach the Environmental Objectives - Hazardous Substances (2.64 MB)
Tisza River Sub-basin, February 2008 -
Map 13: Risk to reach the Environmental Objectives - Organic Pollution (2.64 MB)
Tisza River Sub-basin, February 2008 -
Map 12: Risk to reach the Environmental Objectives - Nutrient Pollution (2.65 MB)
Tisza River Sub-basin, February 2008 -
Map 11: Risk to reach the Environmental Objectives - Hydromorphological Alterations (2.64 MB)
Tisza River Sub-basin, February 2008