Search Results
-
Public Consultation for the Draft Management Plan Updates 2027
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.
-
Map of the Danube Accident Emergency Warning System (AEWS) (979.79 KB)
Map 3 of the report "Transboundary Accident Prevention and Control in the Danube River Basin" -
Transboundary Accident Prevention and Control in the Danube River Basin (6.9 MB)
An illustrative technical report for the public -
AEWS Manual (769.2 KB)
International Operations Manual for PIACs of the Danube AEWS. -
AEWS Manual - Deutsch (331.12 KB)
International Operations Manual for PIACs of the Danube AEWS - German translation -
Pollution Management Expert Group
The Pollution Management Expert Group (PM EG) deals with pollution-related pressures, identifies the drivers behind them, and recommends measures to address pollution sources.
-
ToR PM EG (270.1 KB)
Terms of Reference of the Pressures and Measures Expert Group (PM EG), IC-105 rev3-final 2016 -
Accident at Ajka alumnia plant
Kolotar, 4 October 2010. The acute toxic risk deriving from the heavy metals in the red sludge is rather low, as their concentrations are rather low. However, the chronic toxicity threat is high.
-
Danger heading downstream: the Accident Emergency Warning System in action
-
AEWS - Accident Emergency Warning System
The Accident Emergency Warning System (AEWS) of the Danube River Basin is activated whenever there is a risk of transboundary water pollution, or threshold danger levels of certain hazardous substances are exceeded.