Search Results
Public Consultation Process towards the 2021 Management Plans Updates
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of WFD and FD, comprising strategic guiding plans for water management over the course of six years. Both are to be developed with a range of public consultation measures.
-
WFD & FD Public Participation Schedule (326.84 KB)
This document focuses on the basin-wide level and is complementary to the public participation processes on the national and sub-basin levels, which follow closely Article 14 of the WFD and its... -
AEWS Manual (769.2 KB)
International Operations Manual for PIACs of the Danube AEWS. -
AEWS Manual - Deutsch (331.12 KB)
International Operations Manual for PIACs of the Danube AEWS - German translation Public Participation Schedule WFD & FD
Vienna, 19 Dec 2018. According to Art. 14 of the Water Framework Directive, public participation in drafting River Basin Management Plans needs to be ensured. The ICPDR now provides a blue print for Public Participation activities for the development of the third Danube River Basin Management Plan (3rd DRBMP) until 2021 and the second Danube River Basin Flood Risk Management Plan (2nd FRMP).
-
Public Participation Schedule WFD & EFD (74.21 KB)
Accident at Ajka alumnia plant
Kolotar, 4 October 2010. The acute toxic risk deriving from the heavy metals in the red sludge is rather low, as their concentrations are rather low. However, the chronic toxicity threat is high.
Danger heading downstream: the Accident Emergency Warning System in action
AEWS - Accident Emergency Warning System
The Accident Emergency Warning System (AEWS) of the Danube River Basin is activated whenever there is a risk of transboundary water pollution, or threshold danger levels of certain hazardous substances are exceeded.