Search Results
-
Consultation 2015: Aarhus Centre BiH (42.07 KB)
Public consultation on 2015 management plans
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. The most important work plans of the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan. Both were developed with a range of public consultation measures.
-
AEWS Manual (769.2 KB)
International Operations Manual for PIACs of the Danube AEWS. -
AEWS Manual - Deutsch (331.12 KB)
International Operations Manual for PIACs of the Danube AEWS - German translation Public Participation on SWMIs for 2015 Management Plans: National Level
The countries of the ICPDR provide interim overviews on Significant Water Management Issues in the Danube River Basin District for national River Basin Management Plans which are currently developed until 2015. The countries invite the public to comment on this important step 22nd June 2014. Here, we proivde links to national websites with further information.
-
Interim Overview Significant Water Management Issues in DRBD (527.76 KB)
-
Public Participation Schedule WFD & EFD (74.21 KB)
Accident at Ajka alumnia plant
Kolotar, 4 October 2010. The acute toxic risk deriving from the heavy metals in the red sludge is rather low, as their concentrations are rather low. However, the chronic toxicity threat is high.
Danger heading downstream: the Accident Emergency Warning System in action
AEWS - Accident Emergency Warning System
The Accident Emergency Warning System (AEWS) of the Danube River Basin is activated whenever there is a risk of transboundary water pollution, or threshold danger levels of certain hazardous substances are exceeded.