Search Results
Displaying 31 - 40 of 58 results found
ICPDR Releases "Ice Report 2017"
Freezing weather conditions in the winter months have been a fact of life on the Danube since time immemorial, but the months of January and February 2017 saw many countries in the Danube Basin and its tributaries facing an especially bleak situation.
Solutions for a frozen river: cross border ice control on the Danube
Ice control has a long history on the Danube river. The extremely low temperatures experienced in the past weeks throughout the Danube River basin which have been causing continuous ice formation on the Danube are reminding us of the importance of cross-border cooperation.
-
DRBMP Update 2015 - Map 35: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (1.82 MB)
-
DRBMP Update 2015 - Map 34: Alteration of River Continuity for Fish Migration – Expected Improvements by 2021 (2.04 MB)
-
DRBMP Update 2015 - Map 27: Hydropower Plants – Reference Situation 2012 (1.74 MB)
-
DRBMP Update 2015 - Map 20: Heavily Modified and Artificial Surface Water Bodies (1.58 MB)
-
DRBMP Update 2015 - Map 15: Future Infrastructure Projects (1.61 MB)
-
DRBMP Update 2015 - Map 12: Hydrological Alterations – Impoundments: Current Situation 2015 (1.66 MB)
-
DRBMP Update 2015 - Map 11: Wetlands / Floodplains (>500 ha) with Reconnection Potential (1.61 MB)
-
DRBMP Update 2015 - Map 9: Alteration of River Continuity for Fish Migration – Current Situation 2015 (1.68 MB)