Search Results
Displaying 41 - 50 of 72 results found
-
DRBMP Update 2015 - Map 20: Heavily Modified and Artificial Surface Water Bodies (1.58 MB)
-
DRBMP Update 2015 - Map 15: Future Infrastructure Projects (1.61 MB)
-
DRBMP Update 2015 - Map 12: Hydrological Alterations – Impoundments: Current Situation 2015 (1.66 MB)
-
DRBMP Update 2015 - Map 11: Wetlands / Floodplains (>500 ha) with Reconnection Potential (1.61 MB)
-
DRBMP Update 2015 - Map 9: Alteration of River Continuity for Fish Migration – Current Situation 2015 (1.68 MB)
Practical advice for building fish migration aids
Vienna, 26 March 2013. The ICPDR has published a manual with practical advice for measures that aim to ensure fish migration at transverse structures such as dams and weirs.
-
Measures for ensuring fish migration at transverse structures (1.03 MB)
-
ICPDR Climate Change Adaptation Strategy 2012 (4.15 MB)
In order to take the required steps on adaptation to climate change, the ICPDR was asked in the “Danube Declaration” from 2010 to develop a Climate Adaptation Strategy for the Danube River Basin by... Workshop on River and Habitat Continuity
Vienna, 4/5 September 2012. The ICPDR held a workshop on river and habitat continuity to support the ongoing developments in the implementation of the EU Water Framework Directive and related legislation in the Danube River Basin with regard to addressing river and habitat continuity.
-
Danube Climate Adaptation Study 2012 - Annex (2.17 MB)