Search Results
-
DRBM Plan Annexes (5.02 MB)
complete set, 426 pages -
Danube River Basin Management Plan (8.44 MB)
Danube River Basin Management Plan (DRBMP) 2009
The Danube River Basin Management Plan guides the way to achieving at least good status for all waters of the Danube River Basin. The plan below covers the period from 2009 until 2015.
Danger heading downstream: the Accident Emergency Warning System in action
-
All Annexes (1.42 MB)
Annexes 1 to 13 of Danube Basin Analysis (WFD Roof report 2004) -
Danube Basin Analysis (WFD Roof report) 2004 (9.56 MB)
The Danube River Basin District - River basin characteristics, impacts of human activities and economic analysis required under Article 5, Annex II and Annex III, and inventory of protected areas... -
DBA 2004 - Map 8: Potential Accident Risk Spots (2.96 MB)
Potential Accident Risk Spots Layers: Potential Accident Risk Spots (WRI 5-6, WRI 6-7, WRI 7-8, WRI 8-9) AEWS - Accident Emergency Warning System
The Accident Emergency Warning System (AEWS) of the Danube River Basin is activated whenever there is a risk of transboundary water pollution, or threshold danger levels of certain hazardous substances are exceeded.
Accident Prevention
Accidental pollution in the Danube River Basin can cause widespread damage to the environment, and endanger the health of local people and the state of local economies downstream. This was exemplified by the effects of the Baia Mare cyanide spill in Romania in 2000 or by the Hungarian redsludge accident at Ajka in 2010. The ICPDR is working to prevent accidental pollution and to improve response capability by compiling an inventory of all relevant "Accident Risk Spots".
River Basin Management
The best way to protect and manage water is by close international co-operation between all the countries within the river basin – bringing together all interests upstream and downstream. All countries of the European Union are using a river basin approach for water management since the adoption of the EU Water Framework Directive.