Search Results
Displaying 551 - 560 of 585 results found
-
ICPDR Stakeholder Conference 2005
Participation of the stakeholder is a prerequisite for integrated river basin management planning.
On occasion of Danube Day 2005, the ICPDR invited stakeholders from all riparian countries to participate in the first basin-wide stakeholder conference, which was held in Budapest, as Hungary was the ICPDR President in 2005. -
Annex (3.38 MB)
Photographic documentation of the ITR sampling mission, 2001 -
Final Report (1.72 MB)
Joint Danube Survey: Investigation of the Tisza River and its tributaries Final Report, May 2002 -
JDS Summary Report 2002 - German (1.91 MB)
Gesetzlicher Rahmen, Vorbereitung der Donau-Untersuchung, Untersuchungsergebnisse, Der oeِkologische Zustand der Donau und ihrer Nebenflüsse, Der chemische Zustand der Donau und ihrer Nebenflüsse... -
JDS Summary Report 2002 (2.27 MB)
Institutional Background, Preparing the Joint Danube Survey, Findings of the Survey, Ecological Status of the Danube and its Major Tributaries, Chemical Status of the Danube and its Major Tributaries... -
Aktionsprogramm für nachhaltigen Hochwasserschutz (502.26 KB)
Deutsche Fassung des "Flood Action Programs": Aktionsprogramm für nachhaltigen Hochwasserschutz im Einzugsgebiet der Donau -
Tisza Investigation
The investigation of the Tisza River was a follow-up project of the Joint Danube Survey 2001 organised by the ICPDR. The objective of the survey was to investigate the water quality along the river and to promote public awareness. The countries participating at the survey include Romania, Slovakia, Hungary, and Serbia and Montenegro.
-
Flood Action Programme (1.85 MB)
Action Programme for Sustainable Flood Protection in the Danube River Basin -
All Annexes (1.42 MB)
Annexes 1 to 13 of Danube Basin Analysis (WFD Roof report 2004) -
Danube Basin Analysis (WFD Roof report) 2004 (9.56 MB)
The Danube River Basin District - River basin characteristics, impacts of human activities and economic analysis required under Article 5, Annex II and Annex III, and inventory of protected areas...