Search Results
Displaying 31 - 40 of 57 results found
-
DRBMP Update 2015 - Map 35: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (1.82 MB)
-
DRBMP Update 2015 - Map 34: Alteration of River Continuity for Fish Migration – Expected Improvements by 2021 (2.04 MB)
-
DRBMP Update 2015 - Map 27: Hydropower Plants – Reference Situation 2012 (1.74 MB)
-
DRBMP Update 2015 - Map 20: Heavily Modified and Artificial Surface Water Bodies (1.58 MB)
-
DRBMP Update 2015 - Map 15: Future Infrastructure Projects (1.61 MB)
-
DRBMP Update 2015 - Map 12: Hydrological Alterations – Impoundments: Current Situation 2015 (1.66 MB)
-
DRBMP Update 2015 - Map 11: Wetlands / Floodplains (>500 ha) with Reconnection Potential (1.61 MB)
-
DRBMP Update 2015 - Map 9: Alteration of River Continuity for Fish Migration – Current Situation 2015 (1.68 MB)
River Mur wins IRF European Riverprize 2014
Vienna, 28 October 2014. The IRF European Riverprize 2014 was awarded to the Austrian stretch of the River Mur. All three finalists were from the Danube River Basin.
Rhine Commission wins International Riverprize
Canberra, 16 September 2014. The International Commission for the Protection of the Rhine (ICPR) won the 2014 Thiess International Riverprize. The award was presented in front of river professionals from all over the world at the Riverprize Gala Dinner, held in conjunction with the International Riversymposium. This follows the award of the European Riverprize last year.