Search Results
Displaying 51 - 60 of 68 results found
-
ToR PM EG (270.1 KB)
Terms of Reference of the Pressures and Measures Expert Group (PM EG), IC-105 rev3-final 2016 Sava River Basin Management Plan - Public Consultation
Zagreb, 9 January 2012. The draft Sava River Basin Management Plan (Sava RBMP) is available for public consultation until 21 April 2012. The Sava Commission has set up a website that offers a possibility to the public to respond to the consultation online, by submitting comments or suggestions in a form provided online.
-
MONERIS User's Manual - Part 2 (3.96 MB)
Version 2.0, July 2007 -
MONERIS User's Manual - Part 1 (3.45 MB)
Version 2.0, July 2007 -
Sava River Basin Overview Map (1.55 MB)
Sub-river Basin of the Danube River Basin District, January 2006 Transboundary cooperation brings the Sava Commission closer to its goals
ICPDR Danube Watch
The heavy price tag for clean water
Article in Danube Watch 02/2006
-
DBA 2004 - Map 13: Nutrient Pollution (3.2 MB)
Risk of failure to reach the Environmental Objectives - Nutrient Pollution Layers: Surface Water Bodies (Water body at risk, Water body possibly at risk, Water body not at risk) -
DBA 2004 - Map 12: Hazardous Substances (3.2 MB)
Risk of failure to reach the Environmental Objectives - Hazardous Substances Layers: Surface Water Bodies (Water body at risk, Water body possibly at risk, Water body not at risk) -
DBA 2004 - Map 11: Organic Pollution (3.19 MB)
Risk of failure to reach the Environmental Objectives - Organic Pollution Layers: Surface Water Bodies (Water body at risk, Water body possibly at risk, Water body not at risk)