Search Results
Displaying 1 - 10 of 143 results found
23rd Standing Working Group Meeting Held in Postojna, Slovenia
The 23rd Standing Working Group (StWG) meeting of the ICPDR took place 17-18 June 2025 in Postojna, Slovenia, gathering representatives from across the Danube River Basin to review progress and align on next steps.
Flood Hazard and Risk Maps
According to Floods Directive, the Member States shall, at the level of the river basin district or unit of management, prepare flood hazard maps and flood risk maps at the most appropriate scale for the areas identified under Article 5(1).
Danube Watch 3/2021 - The Ministers of the Danube
-
DRBMP Update 2021 - Map 39: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (3.46 MB)
-
DRBMP Update 2021 - Map 38: Wetlands/Floodplains (>500 ha) with Reconnection Potential – Expected Restoration Measures by 2027 (3.26 MB)
-
DRBMP Update 2021 - Map 37: River Morphological Alterations – Expected Restoration Measures by 2027 (3.42 MB)
-
DRBMP Update 2021 - Map 36: Interruptions of River Continuity for Fish Migration – Expected Restoration Measures by 2027 (3.4 MB)
-
DRBMP Update 2021 - Map 35: Hydrological Alterations - Hydropeaking – Expected Restoration Measures by 2027 (3.25 MB)
-
DRBMP Update 2021 - Map 34: Hydrological Alterations - Water Abstractions – Expected Restoration Measures by 2027 (3.25 MB)
-
DRBMP Update 2021 - Map 33: Hydrological Alterations - Impoundments – Expected Restoration Measures by 2027 (3.27 MB)