Search Results
Danube Countries Start a Joint Sturgeon Monitoring Initiative to Save Europe’s Migratory Giants
Bucharest, Romania – Nine countries along the Danube River have joined forces to protect some of Europe’s most endangered species: the sturgeons. On 9–10 July, thirteen project partners and strategic allies – including national ministries, universities, NGOs and research bodies – gathered in Bucharest to launch “MonStur in the Danube,” a new cross-border effort to monitor and protect these ancient migratory fish.
MonStur in the Danube Project
Sturgeons, the most endangered group of species worldwide, are facing a perilous situation in Europe. These migratory species, which once freely swam from the Black Sea up to Germany, now find their ecological corridors severed by multiple barriers. Human interventions - such as hydropower, sediment extraction, navigation, river channelisation, by-catch and illegal fishing - are exerting severe pressure on habitats and populations, calling for immediate, coordinated actions.
23rd Standing Working Group Meeting Held in Postojna, Slovenia
The 23rd Standing Working Group (StWG) meeting of the ICPDR took place 17-18 June 2025 in Postojna, Slovenia, gathering representatives from across the Danube River Basin to review progress and align on next steps.
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... Danube Watch 3/2021 - Danube River Basin Management Plan
Danube Watch 3/2021 - The Ministers of the Danube
-
DRBMP Update 2021 - Map 39: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (3.46 MB)
-
DRBMP Update 2021 - Map 38: Wetlands/Floodplains (>500 ha) with Reconnection Potential – Expected Restoration Measures by 2027 (3.26 MB)
-
DRBMP Update 2021 - Map 37: River Morphological Alterations – Expected Restoration Measures by 2027 (3.42 MB)
-
DRBMP Update 2021 - Map 36: Interruptions of River Continuity for Fish Migration – Expected Restoration Measures by 2027 (3.4 MB)