Search Results
23rd Standing Working Group Meeting Held in Postojna, Slovenia
The 23rd Standing Working Group (StWG) meeting of the ICPDR took place 17-18 June 2025 in Postojna, Slovenia, gathering representatives from across the Danube River Basin to review progress and align on next steps.
-
2021 Report on the MONERIS model application (4.73 MB)
New Study Shows Restored Floodplains Can Remove Significant Amounts of Nitrate Pollution in the Danube River Basin
A recent large-scale modelling study has shown that restoring floodplains and reconnecting cut-off water bodies with the Danube River, and its tributaries could play a significant role in improving water quality and removing nitrate pollution in the Danube River Basin.
Danube Watch 3/2021 - The Ministers of the Danube
-
DRBMP Update 2021 - Map 26: Chemical Status of Groundwater Bodies of Basin-wide Importance (3.37 MB)
-
DRBMP Update 2021 - Map 25: Quantitative Status of Groundwater Bodies of Basin-wide Importance (3.38 MB)
-
DRBMP Update 2021 - Map 4: Transboundary Groundwater Bodies (3.96 MB)
(Press Release) World Water Day 2022: Celebrating the groundwater of our shared basin
VIENNA, 22 March – World Water Day 2022 is focusing on groundwater and making the invisible visible.
-
Groundwater Guidance (2.84 MB)
ICPDR convenes 20th annual ordinary meeting
On Tuesday 12 and Wednesday 13 December 2017, the ICPDR held its 20th Ordinary Meeting in Vienna. Beside the heads of delegation and representatives of 13 of the contracting parties to the ICPDR, around 85 participants from all Danube countries, observers and invited guests attended this important event.