Search Results

Displaying 1 - 10 of 40 results found
  • Legal Documents

    Terms of Reference - Technical Expert for Water Management-Pollution Control at the ICPDR Secretariat (223.13 KB)

    Terms of Reference for the Open Position of Technical Expert for Water Management-Pollution Control at the ICPDR Secretariat
  • Legal Documents

    Terms of Reference for the Open Position of GIS Expert at the ICPDR Secretariat (221.91 KB)

    Terms of Reference for the Open Position of GIS Expert at the ICPDR Secretariat.
  • News & Media

    ICPDR publishes a technical report on accidental pollution hazard

    Presenting the latest in hazard and risk assessments, the ICPDR Technical Report on Accidental Pollution Hazards provides an in-depth analysis of accidental pollution. It highlights updated inventories for Accident Hazard Sites (AHS) and Tailings Management Facilities (TMF), employing advanced methodologies like the Water Hazard Index and Tailings Risk Index. Focusing on the most hazardous sites, the report also offers key recommendations for sustainable pollution prevention

  • Publications

    Accidental Pollution Hazard in the Danube River Basin (Final Report) (1.69 MB)

    This technical report presents the results of the latest hazard and risk assessments regarding accidental pollution based on currently updated inventories, providing full technical information on...
  • News & Media

    Successful Biannual Danube Forecasting Forum (DAFF) Enhances Flood Forecasting

    On October 10th and 11th, the much-anticipated biannual Danube Forecasting Forum (DAFF) took place in Budapest, Hungary. Organized in collaboration with the International Commission for the Protection of the Danube River (ICPDR) and the EU Joint Research Center (EU JRC), this event brought together stakeholders from the 13 countries along the Danube and members of the Danube Youth Council (DYC) under EUSDR PA5.

  • Maps & Data

    Map of the Danube Accident Emergency Warning System (AEWS) (979.79 KB)

    Map 3 of the report "Transboundary Accident Prevention and Control in the Danube River Basin"
  • Content pages

    Preliminary Flood Risk Assessment (PFRA)

    In accordance with Article 4 of the EU Floods Directive (FD), the first milestone in the FD basin-wide implementation is undertaking a preliminary flood risk assessment (PFRA), as well as identifying those areas for which it has been concluded that potential significant flood risks exist or might be considered likely to occur, so-called Areas of Potential Significant Flood Risk (APSFR), as in accordance with FD Article 5.

  • Content pages

    Accident Prevention & Control

    Accidental pollution events are dangerous form of water contamination by hazardous substances. Industrial facilities, mining areas and contaminated sites that store, process or produce such substances in substantial amounts pose hazard (potential risk) to water. To avoid pollution accidents appropriate prevention measures have to be in place.

  • News & Media 1 March 2023

    ICPDR Executive Secretary Continues her Tour of the Danube with Slovenian Visit

    With the start of her tenure as our Executive Secretary last summer, Birgit Vogel has set out to prioritize building solid professional relationships with ICPDR stakeholders and members, planning to personally visit as many Danube countries as possible. Ms. Vogel met with Uroš Brežan. Slovenian Water Minister, and a broad range of water actors on her latest visit to Slovenia.

  • News & Media

    Accident Prevention and Control in the Danube River Basin: An ICPDR Technical Report Targeted to the Public

    The ICPDR has published an informative summary report on accident prevention and control for dissemination to the interested public. It highlights the ICPDR activities on basin-wide level for accident prevention and emergency management, focusing on the tools, pragmatic procedures and mechanisms that are available for the ICPDR member countries.