Search Results
Displaying 1 - 10 of 256 results found
23rd Standing Working Group Meeting Held in Postojna, Slovenia
The 23rd Standing Working Group (StWG) meeting of the ICPDR took place 17-18 June 2025 in Postojna, Slovenia, gathering representatives from across the Danube River Basin to review progress and align on next steps.
Sub-basins
Sub-basins are smaller working units within a larger river basin or catchment area. They represent a distinct geographical area that is delineated based on the natural drainage patterns of rivers and their tributaries. Sub-basins are used to facilitate the management and assessment of water resources, allowing for more focused and localized analysis and planning within the broader context of the overall river basin.
Danube Watch 3/2021 - WACOM: Water Contingency Management in the Sava River Basin
Danube Watch 3/2021 - Danube River Basin Management Plan
Danube Watch 3/2021 - The Ministers of the Danube
-
DRBMP Update 2021 - Map 39: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (3.46 MB)
-
DRBMP Update 2021 - Map 38: Wetlands/Floodplains (>500 ha) with Reconnection Potential – Expected Restoration Measures by 2027 (3.26 MB)
-
DRBMP Update 2021 - Map 37: River Morphological Alterations – Expected Restoration Measures by 2027 (3.42 MB)
-
DRBMP Update 2021 - Map 36: Interruptions of River Continuity for Fish Migration – Expected Restoration Measures by 2027 (3.4 MB)
-
DRBMP Update 2021 - Map 35: Hydrological Alterations - Hydropeaking – Expected Restoration Measures by 2027 (3.25 MB)