Search Results
2018 Interim Report on the Implementation of the Joint Programme of Measures in the Danube River Basin
The ICPDR has released a 23-page Interim Report on the implementation of its ‘Joint Program of Measures in the Danube River Basin’. The brochure is both a snapshot of the progress being made, and a look at the future of the ICPDR’s three main aims: to make Danube waters “cleaner”, “healthier”, and “safer”. It’s also the first such publication by the ICPDR to take on a new design-focused look, deploying more images and a clearer language in a public-friendly format.
Danube Watch 1/2016 - A new plan for the Danube’s future
-
Annexes of the Integrated Tisza River Basin Management Plan 2010 (7.01 MB)
-
Maps of the Integrated Tisza River Basin Management Plan 2010 (15.86 MB)
Interim Report on Implementation of the Joint Program of Measures in the DRBD (2012)
Interim Report on Implementation of the Joint Program of Measures in the Danube River Basin District according to Water Framework Directive Art. 15 of 2012. Main report and relevant annexes.
Finding financing: funding options for the Joint Programme of Measures
-
Background Paper: reducing hazardous substances (142.74 KB)
Workshop on Joint Program of Measures
Vienna, 4-5 April 2013. The ICPDR will hold a meeting to discuss the results of the Danube Joint Program of Measures, to learn about funding needs and existing potential funding for the actions, and to discuss the preparation of the Danube Basin Analysis and the 2nd Danube River Basin Management Plan.
-
Reducing Nutrient Pollution: Challenges in Agriculture (322.71 KB)
2012 interim report on implementation of Joint Program of Measures
Vienna, 10 Jan 2013. The 2012 "Interim Report on the Implementation of the Joint Program of Measures in the Danube River Basin District" was published by the ICPDR. Here you can download the document.