Search Results
Displaying 1 - 10 of 30 results found
-
2021 Report on the MONERIS model application (4.73 MB)
-
New Study Shows Restored Floodplains Can Remove Significant Amounts of Nitrate Pollution in the Danube River Basin
A recent large-scale modelling study has shown that restoring floodplains and reconnecting cut-off water bodies with the Danube River, and its tributaries could play a significant role in improving water quality and removing nitrate pollution in the Danube River Basin.
-
Danube Watch 3/2021 - ICPDR Presidency 2022
-
We Pass: Explained (low resolution) (9.37 MB)
A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates. (Lower Resolution version) -
We Pass: Explained (15.01 MB)
A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates. -
Updated Integrated Tisza River Basin Management Plan 2019 - Maps (44.99 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 - Annexes (8.08 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 (4.62 MB)
-
Tisza Group, Memorandum of Understanding (2019) (1.53 MB)
"Strengthening of Tisza River Basin cooperation: Towards the implementation of the Integrated Tisza River Basin Management Plan supporting the sustainable development of the region" -
ICPDR's We Pass Project Holds its 1st Stakeholder Workshop
On Thursday 12 December 2019, We Pass – an EU-funded project with the ICPDR aiming to facilitate fish migration and habitat conservation in the Danube River Basin – held its first stakeholder workshop on the banks of the Danube River in Vienna, Austria.