Search Results
Displaying 1 - 10 of 23 results found
-
Public Consultation for the Draft Management Plan Updates 2027
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.
-
Danube Watch 3/2021 - ICPDR Presidency 2022
-
Updated Integrated Tisza River Basin Management Plan 2019 - Maps (44.99 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 - Annexes (8.08 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 (4.62 MB)
-
Tisza Group, Memorandum of Understanding (2019) (1.53 MB)
"Strengthening of Tisza River Basin cooperation: Towards the implementation of the Integrated Tisza River Basin Management Plan supporting the sustainable development of the region" -
Annexes of the Integrated Tisza River Basin Management Plan 2010 (7.01 MB)
-
Maps of the Integrated Tisza River Basin Management Plan 2010 (15.86 MB)
-
ICPDR Organigram (35.57 KB)
Structure of the ICPDR including Permanent Secretariat, Expert Groups and Task Groups. -
Integrated Tisza River Basin Management Plan 2010 (2.1 MB)