Search Results
-
Public Consultation for the Draft Management Plan Updates 2027
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.
-
Updated Integrated Tisza River Basin Management Plan 2019 - Maps (44.99 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 - Annexes (8.08 MB)
-
Updated Integrated Tisza River Basin Management Plan 2019 (4.62 MB)
-
Tisza Group, Memorandum of Understanding (2019) (1.53 MB)
"Strengthening of Tisza River Basin cooperation: Towards the implementation of the Integrated Tisza River Basin Management Plan supporting the sustainable development of the region" -
Danube Declaration 2016 (214.47 KB)
Adopted at the ICPDR Ministerial Meeting on 9 February 2016: Water Management in the Danube River Basin: Integration and Solidarity in the most international river basin of the world -
Danube River Basin Management Plan (DRBMP) Update 2015
Since the publication of the first Danube River Basin Management Plan (DRBMP) in 2009, the ICPDR updates the DRBMP every six years as requested by the EU Water Framework Directive. On this page you can download the Danube River Basin Management Plan (DRBMP) Update 2015 and all its annexes and maps.
-
DRBMP Update 2015 - Map 37: Hydrological Alterations – Expected Improvements by 2021 (1.67 MB)
-
DRBMP Update 2015 - Map 36: Alteration of River Morphology – Expected Improvements by 2021 (1.56 MB)
-
DRBMP Update 2015 - Map 35: Ecological Prioritisation Regarding Restoration Measures for River and Habitat Continuity (1.82 MB)