Search Results
Displaying 1 - 7 of 7 results found
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... -
Danube in Your Pocket (20.83 MB)
Discover the remarkable diversity of life that thrives within the Danube River Basin through our captivating map. Designed to engage and educate the general public, our map showcases the extraordinary... -
ICPDR Sturgeon Strategy 2017 (1.3 MB)
ICPDR’s sturgeon conservation activities are strongly linked to the new EU Biodiversity Strategy. -
The 2015 Droughts in the Danube River Basin (1.94 MB)
In 2015 significant parts of the Danube River Basin were affected by droughts which negatively impacted different water-dependent economic sectors, vegetation and the aquatic environment. This is the... -
Annex to the report "The 2015 Droughts in the Danube River Basin" (2.7 MB)
The Annex includes the “Questionnaire on the 2015 Droughts in the Danube River Basin” completed by thirteen Danube countries (AT, BA, BG, CZ, DE, HR, HU, MD, RO, RS, SI, SK and UA) including... Danube Watch 1/2016 - Fighting drought in the Czech Republic
-
Measures for ensuring fish migration at transverse structures (1.03 MB)