Search Results
Water Users
One of the primary advantages provided by the ICPDR is its capacity to assist national decision-makers in effectively balancing the competing needs and various uses of the Danube River. These encompass areas such as hydropower generation, agriculture, and climate risk management. The ICPDR functions as a comprehensive platform for member countries, facilitating consultation, coordination, and the holistic management of the Danube River Basin.
Preliminary Flood Risk Assessment (PFRA)
In accordance with Article 4 of the EU Floods Directive (FD), the first milestone in the FD basin-wide implementation is undertaking a preliminary flood risk assessment (PFRA), as well as identifying those areas for which it has been concluded that potential significant flood risks exist or might be considered likely to occur, so-called Areas of Potential Significant Flood Risk (APSFR), as in accordance with FD Article 5.
Public Consultation 2021: Results
This page contains all of the various documentation on outcomes from the ICPDR's Public Consultation Process for the Danube River Basin Management Plan & Danube Flood Risk Management Plan Updates 2021
Stakeholder Consultation Workshop: Our Opinion – Our Danube
This online workshop took place on 29th/30th June 2021, with more than 130 participants attending.
Public Consultation Process towards the 2021 Management Plans Updates
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of WFD and FD, comprising strategic guiding plans for water management over the course of six years. Both are to be developed with a range of public consultation measures.
Flood Protection Expert Group
The Flood Protection Expert Group (FP EG) deals with ICPDR activities concerning sustainable flood risk management and the development and implementation of the Danube River Basin Flood Risk Management Plan.
JS Meetings: Minutes & Background Documents
In October 2007, a "Joint Statement on Inland Navigation and Environmental Sustainability in the Danube River Basin" was concluded, followed by a series of annual meetings. Here, we present reports, minutes and background materials of these meetings.
Danube FloodRisk Project
The overall objective of the Danube FLOODRISK project was to develop and produce high quality, stakeholder oriented flood hazard and flood risk maps for the transnational Danube river floodplains to provide adequate risk information for spatial planning and economic development activities.
Hydropower
Following a request by the Danube Ministerial Conference 2010, the ICPDR has become active in initiating a dialogue with representatives from the hydropower sector. As an essential step in this process, "Guiding Principles on Sustainable Hydropower Development in the Danube Basin" have been developed by an interdisciplinary team and were finalised and adopted in June 2013.
Flood Risk Management
In response to the hazard of flooding, the ICPDR adopted the Action Programme for Sustainable Flood Prevention in the Danube River Basin at the ICPDR Ministerial Meeting on 13 December 2004. As a follow-up to this Action Programme, seventeen sub-basin flood action plans were published by the ICPDR in 2009.