Search Results
Hydropower
Following a request by the Danube Ministerial Conference 2010, the ICPDR has become active in initiating a dialogue with representatives from the hydropower sector. As an essential step in this process, "Guiding Principles on Sustainable Hydropower Development in the Danube Basin" have been developed by an interdisciplinary team and were finalised and adopted in June 2013.
-
Annexes - 2012 Interim Report on the Implementation of the JPM in the DRBD (1.33 MB)
-
2012 Interim Report on the Implementation of the Joint Program of Measures in the DRBD (1.34 MB)
-
ICPDR Climate Change Adaptation Strategy 2012 (4.15 MB)
In order to take the required steps on adaptation to climate change, the ICPDR was asked in the “Danube Declaration” from 2010 to develop a Climate Adaptation Strategy for the Danube River Basin by... -
2010 Floods in the Danube River Basin (1.74 MB)
Joint Danube Survey
The key purpose of Joint Danube Surveys (JDS) is to produce reliable and comparable information on carefully selected elements of water quality for the length of the Danube River, including its major tributaries. Three Joint Danube Surveys have previously been conducted, in 2001, 2007, 2013, and 2019. The 5th Joint Danube Survey is due to launch on 1st July 2025.
European Riverprize
The IRF European Riverprize is awarded annually since 2013 to reward best practice river basin management from the Urals to the Atlantic. The award was launched in a partnership between the ICPDR, the Coca-Cola Compay, the International River Foundation (IRF) and the European Center for River Restoration.
Disclaimer
Heads of all Delegations (HODs)
Contact