Search Results
Public Participation on SWMIs for 2015 Management Plans: National Level
The countries of the ICPDR provide interim overviews on Significant Water Management Issues in the Danube River Basin District for national River Basin Management Plans which are currently developed until 2015. The countries invite the public to comment on this important step 22nd June 2014. Here, we proivde links to national websites with further information.
-
Interim Overview Significant Water Management Issues in DRBD (527.76 KB)
Danube FloodRisk Project
The overall objective of the Danube FLOODRISK project was to develop and produce high quality, stakeholder oriented flood hazard and flood risk maps for the transnational Danube river floodplains to provide adequate risk information for spatial planning and economic development activities.
-
Assessment Report on Hydropower Generation in the Danube Basin (9.02 MB)
-
Annex: Hydropower Case Studies and Good Practice Examples (1.63 MB)
-
Guiding Principles: Sustainable Hydropower Development in DRB (1.25 MB)
-
Measures for ensuring fish migration at transverse structures (1.03 MB)
-
Platina Manual - Croatian (5.84 MB)
A Croatian manual on "Good Practices in Sustainable Waterway Planning", based on the Platina manual of this name. Hydropower
Following a request by the Danube Ministerial Conference 2010, the ICPDR has become active in initiating a dialogue with representatives from the hydropower sector. As an essential step in this process, "Guiding Principles on Sustainable Hydropower Development in the Danube Basin" have been developed by an interdisciplinary team and were finalised and adopted in June 2013.
-
Annexes - 2012 Interim Report on the Implementation of the JPM in the DRBD (1.33 MB)