Library
Publications, documents and all other content
-
Ship Sturgeon Once Thought Extinct Confirmed in the Drava River
A remarkable discovery has been made in the Drava River: an angler in Croatia recently caught a ship sturgeon (Acipenser nudiventris), a species long believed to be extinct in the Danube River Basin. Measuring 176 centimetres and weighing 35 kilograms, the fish was safely released back into the river after being identified by local authorities. The sighting is encouraging as it marks the first confirmed record of the species in many decades.
-
Transboundary Cooperation for Healthy Rivers: ICPDR Welcomes New Declaration as Model for Danube Basin Collaboration
The ICPDR applauds the recent signing of the"goMURra" Declaration by Austrian Water Minister Norbert Totschnig and Slovenian Minister for Natural Resources Jože Novak. The declaration, signed on 11 November 2025 at the UNESCO 5-Country Biosphere Reserve, marks a significant step forward in transboundary water management and ecological restoration in the Danube River Basin.
-
Danube Countries Start a Joint Sturgeon Monitoring Initiative to Save Europe’s Migratory Giants
Bucharest, Romania – Nine countries along the Danube River have joined forces to protect some of Europe’s most endangered species: the sturgeons. On 9–10 July, thirteen project partners and strategic allies – including national ministries, universities, NGOs and research bodies – gathered in Bucharest to launch “MonStur in the Danube,” a new cross-border effort to monitor and protect these ancient migratory fish.
-
23rd Standing Working Group Meeting Held in Postojna, Slovenia
The 23rd Standing Working Group (StWG) meeting of the ICPDR took place 17-18 June 2025 in Postojna, Slovenia, gathering representatives from across the Danube River Basin to review progress and align on next steps.
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... -
Interim Report on the Implementation of the Joint Program of Measures in the Danube River Basin 2024 (21.78 MB)
This brochure is a snapshot of the progress to implement measures improving the environmental situation of the waters in the Danube River Basin today and what’s still yet to come as the region’s many... -
Danube Watch 3/2021 - The Ministers of the Danube
-
Danube Watch 2/2021 - WePass: Explained
-
We Pass: Explained (low resolution) (9.37 MB)
A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates. (Lower Resolution version) -
We Pass: Explained (15.01 MB)
A brochure explaining the findings and activities (2018 – 2021) under We Pass: Facilitating Fish Migration and Conservation at the Iron Gates.