Library
Publications, documents and all other content
Displaying 1 - 5 of 5 items
-
FRM Plan: Draft Annex 1 (Hazard and Risk Maps Update) (5.72 MB)
The draft Annex 1 of the 1st Flood Risk Management Plan for the DRB, provided for public comments. -
5,000 Sterlets released into Danube
Belene, 18 November 2014. WWF has released some 5,000 sterlets into the Danube River today as part of a 50,000-strong sturgeon restocking programme. This is the first restocking of endangered sturgeons performed by a non-government organization in Bulgaria, after years of scientific research, climatic and biological challenges.
-
2013 Floods in the Danube River Basin (1.39 MB)
-
2002 Floods in the Danube River Basin (119.18 KB)
-
Map of Areas of Potential Significant Flood Risk in DRB 2013 (7.39 MB)