Library
Publications, documents and all other content
Displaying 1 - 4 of 4 items
-
Public consultation concludes with strong feedback
Danube Basin, 23 July 2015. For over six months, stakeholders of the Danube were called to share their views on the draft management plans for the Danube River Basin. As of 22 July, the public consultation phase convened with strong feedback received through different channels.
-
2012 interim report on implementation of Joint Program of Measures
Vienna, 10 Jan 2013. The 2012 "Interim Report on the Implementation of the Joint Program of Measures in the Danube River Basin District" was published by the ICPDR. Here you can download the document.
-
Annexes - 2012 Interim Report on the Implementation of the JPM in the DRBD (1.33 MB)
-
2012 Interim Report on the Implementation of the Joint Program of Measures in the DRBD (1.34 MB)