Library
Publications, documents and all other content
Displaying 1 - 10 of 18 items
-
2012 interim report on implementation of Joint Program of Measures
Vienna, 10 Jan 2013. The 2012 "Interim Report on the Implementation of the Joint Program of Measures in the Danube River Basin District" was published by the ICPDR. Here you can download the document.
-
Annexes - 2012 Interim Report on the Implementation of the JPM in the DRBD (1.33 MB)
-
2012 Interim Report on the Implementation of the Joint Program of Measures in the DRBD (1.34 MB)
-
Maps 4, 7, 15-23 (3.6 MB)
Surface Layers Permeability, Isohyets of the Multi-Annual Mean Precipitation, Mean Annual Runoff, Flood Defences (Hungary, Ukraine), Improvement of Flood Conveyance Capacity (Hungary), Flood (Hungary)... -
Map 14: Risk to reach the Environmental Objectives - Hazardous Substances (2.64 MB)
Tisza River Sub-basin, February 2008 -
Map 13: Risk to reach the Environmental Objectives - Organic Pollution (2.64 MB)
Tisza River Sub-basin, February 2008 -
Map 12: Risk to reach the Environmental Objectives - Nutrient Pollution (2.65 MB)
Tisza River Sub-basin, February 2008 -
Map 11: Risk to reach the Environmental Objectives - Hydromorphological Alterations (2.64 MB)
Tisza River Sub-basin, February 2008 -
Map 10b: Important Transboundary Groundwater Bodies: Chemical and Quantitative Monitoring (3 MB)
Tisza River Sub-basin, February 2008 -
Map 10a: Surface Waterbody Monitoring Stations (1.61 MB)
Tisza River Sub-basin, February 2008