Library
Publications, documents and all other content
-
Public Participation Schedule WFD & FD
Vienna, 19 Dec 2018. According to Art. 14 of the Water Framework Directive, public participation in drafting River Basin Management Plans needs to be ensured. The ICPDR now provides a blue print for Public Participation activities for the development of the third Danube River Basin Management Plan (3rd DRBMP) until 2021 and the second Danube River Basin Flood Risk Management Plan (2nd FRMP).
-
ICPDR Climate Change Adaptation Strategy 2012 (4.15 MB)
In order to take the required steps on adaptation to climate change, the ICPDR was asked in the “Danube Declaration” from 2010 to develop a Climate Adaptation Strategy for the Danube River Basin by... -
15th Ordinary Meeting in Vienna
Vienna, 11 - 12 December 2012. The ICPDR has held its 15th Ordinary Meeting in Vienna. At this plenary meeting of the commission, important decisions were made. Here you find a photo gallery showing some of the highlights.
-
Romanian Students Win Art Master 2006
Vienna, 11 December 2006. “Two young Romanians have won the ‘International Danube Art Master 2006’ competition, for their creation titled ‘The Danube Flows Through Us’’, announced Philip Weller, Executive Secretary of the ICPDR today. Mr. Weller made the announcement at the Annual Meeting of the Delegations to the ICPDR being held at the Vienna International Centre.
-
ICPDR Annual Report 2005 (4.57 MB)
-
Danube Watch 2/2006 (1.28 MB)
-
Flood Safety Projects along the Tisza river in Hungary
Article in Danube Watch 02/2006
-
Tisza Basin Cooperation
Article in Danube Watch 02/2006
-
Clean clothing, dirty river?
Article in Danube Watch 02/2006
-
Romania bans sturgeon fishing for ten years
Article in Danube Watch 02/2006