Search Results
Displaying 61 - 70 of 143 results found
-
Flood Action Plans
17 flood action plans for all sub-basins in the Danube catchment area were prepared in 2009. They provide the first comprehensive overview of actions aiming to reduce flood risks that was ever prepared in Danube River Basin.
-
ANNEX 4: PARTICIPATING ORGANISATIONS (27.96 KB)
-
Annex 2: List of Participants, January 29-30, 2009, BUDAPEST (56.42 KB)
-
1st Joint Statement Meeting: Minutes (1008.23 KB)
Minutes of the 1st Meeting on the Follow-up of the Joint Statement (Budapest, 29-30 January 2009) -
SAVOLSKIY: WELCOME BY THE PRESIDENT OF THE DANUBE COMMISSION (29.53 KB)
-
BERNABEI: INTERVENTION ON BEHALF OF MR. J. SCHEELE REPRESENTING THE EUROPEAN COMMISSION AT THE BUDAPEST WORKSHOP ON JOINT STATEMENT INITIATIVE FOLLOW-UP (34.19 KB)
-
MILKOVIC: REHABILITATION AND DEVELOPMENT OF NAVIGATION ON THE SAVA RIVER (1.58 MB)
-
BALCU: ISPA 2: DANUBE RIVER BETWEEN IRON GATE II (RKM 863) AND CALARASI (RKM 375) (1.08 MB)
-
TADIC: PRELIMINARY DESIGN FOR THE DANUBE REACH FROM 1400 TO 1410 KM (1.82 MB)
-
BABIC MLADENOVIC: UNSTABLE BED AND BANKS OF THE DANUBE RIVER AT THE "APATIN" SECTOR (984.66 KB)