Search Results
Displaying 131 - 140 of 151 results found
-
Flood action plan of Inn (3.63 MB)
-
Flood action plan for upper Danube (3.45 MB)
Flood Action Plans
17 flood action plans for all sub-basins in the Danube catchment area were prepared in 2009. They provide the first comprehensive overview of actions aiming to reduce flood risks that was ever prepared in Danube River Basin.
-
Flood Action Programme (1.85 MB)
Action Programme for Sustainable Flood Protection in the Danube River Basin -
DBA 2004 - Map 16: Protected Areas (2.95 MB)
Important Water-related Protected Areas for Species and Habitat Protection Layers: Areas for species and habitat protection (< 10,000 ha, 10,000 - 50,000 ha, > 50,000 ha), Transboundary co-operation -
DBA 2004 - Map 15: Transboundary Groundwater Bodies (3.01 MB)
Important Transboundary Groundwater Bodies Layers: Important transboundary groundwater bodies of different horizons (transboundary areas > 4000 km²) -
DBA 2004 - Map 14: Hydromorphological Alterations (3.19 MB)
Risk of failure to reach the Environmental Objectives - Hydromorphological Alterations Layers: Surface Water Bodies (Water body at risk, Water body possibly at risk, Water body not at risk) -
DBA 2004 - Map 13: Nutrient Pollution (3.2 MB)
Risk of failure to reach the Environmental Objectives - Nutrient Pollution Layers: Surface Water Bodies (Water body at risk, Water body possibly at risk, Water body not at risk) -
DBA 2004 - Map 12: Hazardous Substances (3.2 MB)
Risk of failure to reach the Environmental Objectives - Hazardous Substances Layers: Surface Water Bodies (Water body at risk, Water body possibly at risk, Water body not at risk) -
DBA 2004 - Map 11: Organic Pollution (3.19 MB)
Risk of failure to reach the Environmental Objectives - Organic Pollution Layers: Surface Water Bodies (Water body at risk, Water body possibly at risk, Water body not at risk)