Search Results
-
Public Consultation for the Draft Management Plan Updates 2027
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.
-
2021 Report on the MONERIS model application (4.73 MB)
-
New Study Shows Restored Floodplains Can Remove Significant Amounts of Nitrate Pollution in the Danube River Basin
A recent large-scale modelling study has shown that restoring floodplains and reconnecting cut-off water bodies with the Danube River, and its tributaries could play a significant role in improving water quality and removing nitrate pollution in the Danube River Basin.
-
Flood action plan for pannonian southern danube (508 KB)
-
Flood action plan for pannonian central danube (2.09 MB)
-
Flood action plan for Delta Liman (2.01 MB)
-
Flood action plan for Prut Siret (4.25 MB)
-
Flood action plan for Lower Danube Corridor (3.21 MB)
-
Flood action plan for Southcentral Romanian tributaries (3.35 MB)
-
Flood action plan for Bulgarian tributaries (1.18 MB)