Search Results
We Pass 2 Project Concludes: Restoring Migration Routes for the Danube’s Iconic Fish
The We Pass 2 project, an ambitious initiative to restore fish migration routes at the Iron Gate Dams on the Danube River, has reached a successful conclusion. Building on the achievements of the original We Pass project, We Pass 2 focused on creating preliminary designs and cost estimates for solutions to enable fish passage at Iron Gate 1 and 2, which sit on the border between Romania and Serbia.
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... Inspiring and Fruitful ICPDR Hydropower Workshop in Vienna
The ICPDR held a highly successful workshop titled "Sustainable Hydropower Development and Environmental Objectives – Framework, Challenges, and Ways Forward" on 4-5 June 2024 at the BOKU River Lab in Vienna. Building on workshops from 2017 and 2021, the event brought together experts from energy and environmental policy sectors, the hydropower industry, NGOs, and researchers.
-
DRBMP Update 2021 - Map 24e: Overall Chemical Status of Surface Water Bodies (2.97 MB)
-
DRBMP Update 2021 - Map 24d: Chemical Status of SWB (Priority Substances in Biota without Brominated Diphenylethers and Mercury) (2.97 MB)
-
DRBMP Update 2021 - Map 24c: Chemical Status of SWB (Priority Substances in Biota) (2.97 MB)
-
DRBMP Update 2021 - Map 24b: Chemical Status of SWB (Priority Substances in Water without Ubiquitous Substances) (2.97 MB)
-
DRBMP Update 2021 - Map 24a: Chemical Status of Surface Water Bodies (Priority Substances in Water) (2.97 MB)
-
DRBMP Update 2021 - Map 23: Ecological Status and Ecological Potential of Surface Water Bodies (3.12 MB)
-
DRBMP Update 2021 - Map 21: Transnational Monitoring Network – Surface Waters (3.29 MB)