Search Results
-
DRBMP Update 2015 - Map 27: Hydropower Plants – Reference Situation 2012 (1.74 MB)
-
DRBMP Update 2015 - Map 20: Heavily Modified and Artificial Surface Water Bodies (1.58 MB)
-
DRBMP Update 2015 - Map 15: Future Infrastructure Projects (1.61 MB)
-
DRBMP Update 2015 - Map 12: Hydrological Alterations – Impoundments: Current Situation 2015 (1.66 MB)
-
DRBMP Update 2015 - Map 11: Wetlands / Floodplains (>500 ha) with Reconnection Potential (1.61 MB)
-
DRBMP Update 2015 - Map 9: Alteration of River Continuity for Fish Migration – Current Situation 2015 (1.68 MB)
JDS3 Results published
Vienna, 22 March 2015. Just in time for this year's World Water Day, the Joint Danube Survey 3 Final Scientific Report was published today.
JDS3 Final Scientific Report available
Vienna, 22 March 2015. The Joint Danube Survey 3 (JDS3) was the world’s biggest river research expedition in 2013. Its results are now available in a comprehensive report, which can be downloaded from this website.
Joint Danube Survey 3
The Joint Danube Survey 3 (JDS3) was the world’s biggest river research expedition of its kind in 2013, the UN International Year of Water Cooperation. Its results were published in a comprehensive report in early 2015.
Practical advice for building fish migration aids
Vienna, 26 March 2013. The ICPDR has published a manual with practical advice for measures that aim to ensure fish migration at transverse structures such as dams and weirs.