Search Results
-
JS Meetings: Minutes & Background Documents
In October 2007, a "Joint Statement on Inland Navigation and Environmental Sustainability in the Danube River Basin" was concluded, followed by a series of annual meetings. Here, we present reports, minutes and background materials of these meetings.
-
2002 Floods in the Danube River Basin (119.18 KB)
-
Map of Areas of Potential Significant Flood Risk in DRB 2013 (7.39 MB)
-
Danube FloodRisk Project
The overall objective of the Danube FLOODRISK project was to develop and produce high quality, stakeholder oriented flood hazard and flood risk maps for the transnational Danube river floodplains to provide adequate risk information for spatial planning and economic development activities.
-
Assessment Report on Hydropower Generation in the Danube Basin (9.02 MB)
-
MAP - Hydropower Plants in the Danube River Basin (2.64 MB)
-
Guiding Principles on Hydropower adopted
Sarajevo, 19 June 2013. As an essential step in maintaining a dialogue with the hydropower sector, the ICPDR's Standing Working Group has adopted the "Guiding Principles on Sustainable Hydropower Development in the Danube Basin". The document is available for download here.
-
Annex: Hydropower Case Studies and Good Practice Examples (1.63 MB)
-
Guiding Principles: Sustainable Hydropower Development in DRB (1.25 MB)
-
Hydropower & Water Management Conference Programme (484.95 KB)