Search Results
-
PEIJS: NEW PERSPECTIVES ON THE INTEGRATED WATERWAY TRANSPORT IN EUROPE AND ALONG THE DANUBE (16.74 KB)
-
Annex 1: AGENDA, January 29-30, 2009, BUDAPEST (98.42 KB)
Joint Statement follow-up meetings - Budapest 2009 and Zagreb 2010
The Danube navigation dialogue, concluded in October 2007 with the finalisation of the "Joint Statement", is continued. A first follow-up meeting was held in January 2009 in Budapest, a second one is held in March 2010 in Zagreb, serving to assessing the progress achieved so far and discussing how to improve the application of the "Joint Statement" in waterway projects.
Development of the Joint Statement in 2007
Between April and October 2007, an integrated stakeholder dialogue was conducted by ICPDR, Danube Commissson and the International Sava Commission. Main activities were 3 workshops and the drafting of the Joint Statement document.
-
Minutes of the 2nd Project Steering Committee Meeting (481.47 KB)
-
Presentation of the 2nd Project Steering Committee Meeting (2.43 MB)
-
Documents for the 2nd Steering Committee Meeting of the UNDP GEF Tisza MSP (2.52 MB)
-
Short listed project ideas (1.73 MB)
-
Drava Declaration (29.32 KB)
Declaration concerning common approaches to water management, flood protection, hydropower utilization and nature and biodiversity conservation in the Drava River Basin. New `Drava Declaration´ Signed
Maribor, 24 September 2008. A “Declaration concerning common approaches to water management, flood protection, hydropower utilization and nature and biodiversity conservation in the Drava River Basin” was adopted by Participants at the “Drava River Vision Symposium” in Maribor, Slovenia.