Search Results

Displaying 1 - 5 of 5 results found
  • Content pages

    Public Consultation for the Draft Management Plan Updates 2027

    The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.

  • Publications

    IC 242 - Wastewater Management in the Danube River Basin (400.7 KB)

    A recommendation paper by the ICPDR, developed for the ongoing revision of the EU Urban Wastewater Treatment Directive (UWWTD).
  • Germany Facts and Figures (109.22 KB)

  • Content pages

    Germany

    The Danube begins at the confluence of the Brigach and Breg Rivers in the city of Donaueschingen located in the Black Forest, Baden-Württemberg. The German Danube catchment area covers an area of about 56,200 km²; its share of the total Danube catchment area is approx. 7%. The German Danube basin is bordered by the Rhine basin to the west and the Elbe River basin to the east.

  • Content pages

    Organic Matter

    Organic pollution has been on the rise in the Danube over the last century, as human activities have resulted in increasing loads of wastewater rich in organic matter. The most serious organic pollution problems occur in tributaries that regularly receive untreated or inadequately treated wastewater from industrial plants and municipalities. Thanks to the significant improvement of wastewater infrastructure and services in the Danube countries, the basin-wide organic emissions reduced by 60% since the mid 2000s.