Search Results
-
Public Consultation for the Draft Management Plan Updates 2027
The ICPDR supports the active involvement of stakeholders and civil society on all levels of its work. Two of the most important plans to the ICPDR are the Danube River Basin Management Plan and the Flood Risk Management Plan, aiming to implement the legal requirements of Water Framework Directive (WFD) and the Floods Directive (FD), comprising strategic guiding plans for water management over the course of six years. Both are to be updated with a range of public consultation measures.
-
Danube River Basin Management Plan Brochure (9.88 MB)
-
Bulgaria bans sturgeon fishing
Sofia, 1 May 2011. In order to protect endangered sturgeon species, Bulgaria decided to ban sturgeon fishing in May 2011. Romania was the first country to implement a sturgeon fishing ban in the Danube in 2006 and is now followed by its southern neighbour.
-
DRBM Plan Maps (25.36 MB)
complete set, 31 maps -
DRBM Plan Annexes (5.02 MB)
complete set, 426 pages -
Danube River Basin Management Plan (8.44 MB)
-
Danube River Basin Management Plan (DRBMP) 2009
The Danube River Basin Management Plan guides the way to achieving at least good status for all waters of the Danube River Basin. The plan below covers the period from 2009 until 2015.
-
Bulgaria
The territory of Bulgaria is 110,912 km². The country is characterized by a rich diversity in morphological, geological, geomorphological, hydro-climatic and soil-biogenic aspects.