Search Results
Displaying 1 - 10 of 41 results found
-
Making the Iron Gate Dams Passable - We Pass 2 (1.98 MB)
The We Pass 2 project is an initiative focused on restoring fish migration routes in the Danube River Basin, particularly at the Iron Gate Dams. By addressing the barriers caused by these hydropower... -
DRBMP Update 2021 - Map 24e: Overall Chemical Status of Surface Water Bodies (2.97 MB)
-
DRBMP Update 2021 - Map 24d: Chemical Status of SWB (Priority Substances in Biota without Brominated Diphenylethers and Mercury) (2.97 MB)
-
DRBMP Update 2021 - Map 24c: Chemical Status of SWB (Priority Substances in Biota) (2.97 MB)
-
DRBMP Update 2021 - Map 24b: Chemical Status of SWB (Priority Substances in Water without Ubiquitous Substances) (2.97 MB)
-
DRBMP Update 2021 - Map 24a: Chemical Status of Surface Water Bodies (Priority Substances in Water) (2.97 MB)
-
DRBMP Update 2021 - Map 23: Ecological Status and Ecological Potential of Surface Water Bodies (3.12 MB)
-
DRBMP Update 2021 - Map 21: Transnational Monitoring Network – Surface Waters (3.29 MB)
-
DRBMP Update 2021 - Map 19: JDS4 Site-specific Biological Contamination (SBC) Index of Invasive Alien Species: Fish (3.3 MB)
-
DRBMP Update 2021 - Map 18: JDS4 Site-specific Biological Contamination (SBC) Index of Invasive Alien Species: Macroinvertebrates (3.3 MB)